Frankfurt

Fraport AG – Refurbishment of Building 201, Terminal 1

20.000 m² Mietfläche 43.380 m² BGF 350 km Datenkabel Foto: Fraport AG/ GENEST

Similar references

Limburg
Conversion and expansion of the existing electrical and network installation during ongoing hospital operations (24h), photo credit: St. Vincenz Hospital Limburg
Wiesbaden
Expansion of the existing Hebbelschule by an extension with a gross floor area of 4,111 m². Photo credit: SHP Architekten BDA Deforth Opitz PartG mbB
Frankfurt
Installation of the communication infrastructure on the 25th to 32nd floors, high-security cabling up to the 2nd basement through operational areas
en_USEnglish