Frankfurt

Fraport AG – Refurbishment of Building 201, Terminal 1

20,000 m² rental area 43,380 m² gross floor area 350 km data cable Photo: Fraport AG/ GENEST

Similar references

Limburg, Limburg-Weilburg district
Renovation work during ongoing school operations, including at the Leo-Sternberg School, Theodor-Heuss School, Tilemann School Photo: Thomas Schmidt
Limburg
Conversion and expansion of the existing electrical and network installation during ongoing hospital operations (24h), photo credit: St. Vincenz Hospital Limburg
Wiesbaden
Expansion of the existing Hebbelschule by an extension with a gross floor area of 4,111 m². Photo credit: SHP Architekten BDA Deforth Opitz PartG mbB
en_USEnglish