Frankfurt

New construction of Terminal 3 at Frankfurt Airport

Capacity for 19 million passengers, 403,000 m² floor space, length of Pier J 600m, length of Pier H 400m, 24 gates in total, construction costs approx. €4 billion

Similar references

Limburg, Limburg-Weilburg district
Renovation work during ongoing school operations, including at the Leo-Sternberg School, Theodor-Heuss School, Tilemann School Photo: Thomas Schmidt
Limburg
Conversion and expansion of the existing electrical and network installation during ongoing hospital operations (24h), photo credit: St. Vincenz Hospital Limburg
Wiesbaden
Expansion of the existing Hebbelschule by an extension with a gross floor area of 4,111 m². Photo credit: SHP Architekten BDA Deforth Opitz PartG mbB
en_USEnglish